 |
| GRC Current Work in Constellation Systems |
| |
Constellation Level II Program
Program Integration
• GRC Point of Contact for Constellation
Program
• Lead Integrated Power Loads Interoperability and Interchangeability Systems
Integration Group (SIG)
• Manage Portable Equipment Panel (PEP) Project
|
|
GRC Extravehicular
Activity (EVA)
• GRC EVA Project Management
• Subsystem Development for a Launch and Entry Suit
- Power, Audio, Software, Avionics
• Manage Power, Communications, Avionics, and Informatics (PCAI) Advanced
Technology Development
|
|
KSC Launch Equipment
Test Facility (LETF)
Vehicle Motion Simulator (VMS)
Project Manager design, development, verification, and validation
of the new Launch Equipment Test Facility (LETF) Vehicle Motion
Simulator for umbilical systems testing at KSC
|
|
Altair and Destination
Systems
Project Manager GRC Altair and Destination Surface Systems
• Altair Power Lead, Support to Communications, Propulsion, Systems Engineering
and Integration
• Destination Surface Systems
Surface Power Lead and Surface Communications Support
|
| |
|

|
 |
|
 |